Ruth, Margaret and Vera set to on the topographical survey using triangulation and offset measurements with tapes, while Jane, Pauline, Alan and Peter conducted a resistivity survey over a 8 x 20metre square grid.
In the meantime, David helped Roger with some surveying using our total station, “Bob the Builder”.The day went very smoothly, and a lot of ground was covered. The geophysics was hard work, but shared between four people it went remarkably quickly.
Jane Lunnon, UWHG
No comments:
Post a Comment